Step-by-step instructions
- Enter or select Workloads migrated.
- Enter or select Workloads planned.
- Tap Calculate.
- Review the result shown directly below the calculator.
Calculate migration completion by comparing workloads migrated with workloads planned.
Calculate migration completion by comparing workloads migrated with workloads planned.
Workloads migrated is divided by Workloads planned and the result is multiplied by 100 to express the relationship as a percentage.
For example, if Workloads migrated is 25 and Workloads planned is 100, the calculated result is 25%.
The result is a percentage. A higher or lower percentage has different meaning depending on the calculator, so compare it with the goal, limit, benchmark, or historical value relevant to your situation.
Tip: Keep all values in compatible units and use values from the same time period when the calculator compares two amounts.